LUVLAB SCOPE — STUDIO · LIVE ROOM · ARTIST LOUNGE · STAGE · SOUND & LIGHTSLUVLAB is currently responsible for the studio, live room, artist lounge, stage, and sound & lighting costs. The equipment registry below is the live spec — read-only here; edits are made in the admin build tracker.
DRAWINGS & DOCUMENTSLatest revision first · older revisions kept, folded below each
LGF Floor Plan2517.GA.001
Rev A — DWGLATEST17 Jul 2026 · Studio KKD
Latest — single-room layout, approved by client & at building control
GF Floor Plan2517.GA.101
Rev A — DWGLATEST17 Jul 2026 · Studio KKD
Acoustic ProposalCahill P3178
Rev 1.01 — PDFLATESTMay 2026 · Cahill Design Consultants
OPEN PDF
Studio Wall Sizes & Floor ImpactAJR / G. Cyrus
Sketch — PDFLATEST17 Jul 2026 · G. Cyrus
Corridor floor-cost comparison for J. Barnes
OPEN PDF
Demolition Plan2517.DE.001
PDFLATEST18 May 2026 · Studio KKD
OPEN PDF
ACOUSTIC MATERIALS — SUPPLIER DATASHEETSAcústica Integral · from D. Le Goff's 22 Jul 2026 pack · doors clear Cahill's 45 dB Rw spec (RS3 51 dB · RS9 48 dB)
Floating floor — ACUSTILASTIC-Nisolation
Datasheet — Rev 5LATEST22 Jul 2026 · Acústica Integral · D. Le Goff
Proposed floating-floor / isolation layer. BIM (Revit .rfa) also supplied.
AWAITING FILE SOURCE
Acoustic door RS3 — Rw 51 dBCahill spec 45 dB · exceeds
Datasheet — Rev 9LATEST22 Jul 2026 · Acústica Integral · D. Le Goff
Rw = 51 dB (certified) · 70 mm lower threshold bar. Clears Cahill's 45 dB door spec.
AWAITING FILE SOURCE
Acoustic door RS9 — Rw 48 dB (no threshold)Cahill spec 45 dB · exceeds
Datasheet — Rev 3LATEST22 Jul 2026 · Acústica Integral · D. Le Goff
Rw = 48 dB (certified) · no lower threshold bar. Clears Cahill's 45 dB door spec.
AWAITING FILE SOURCE
Wall / ceiling insulation — PKB-2isolation
Datasheet — Rev 4LATEST22 Jul 2026 · Acústica Integral · D. Le Goff
Insulation for studio walls and ceilings.
AWAITING FILE SOURCE
Wall / ceiling insulation — LAisolation
Datasheet — Rev 4LATEST22 Jul 2026 · Acústica Integral · D. Le Goff
Insulation for studio walls and ceilings.
AWAITING FILE SOURCE
Wall absorption — ACUSTIDECOabsorption
Datasheet — Rev 14LATEST22 Jul 2026 · Acústica Integral · D. Le Goff
Recommended wall absorption finish.
AWAITING FILE SOURCE
Ceiling absorption — ACUSTIARTabsorption
Datasheet — Rev 23LATEST22 Jul 2026 · Acústica Integral · D. Le Goff
Recommended ceiling absorption.
AWAITING FILE SOURCE
Diffusers & bass traps — TRtreatment
Datasheet — Rev 2LATEST22 Jul 2026 · Acústica Integral · D. Le Goff
Diffuser / bass-trap panels for low-frequency control.
AWAITING FILE SOURCE
3D VENUE · WALKTHROUGH
Arrive at 8 Hanway Place and walk it in first person. Pick a character — dining guest, artist, engineer, staff, investor or job-seeker — set the day and (for guests) your reservation, and the space opens up by role. Job-seekers apply at the door.
WASD / ARROWS TO MOVE · MOUSE TO LOOK · ROOMS GATED BY ROLE, DAY & RESERVATION · v1 BLOCKOUT
No equipment items yetAdd items to map out everything the studio needs — track sponsorship targets and procurement status from needed → installed
👁 VIEW-ONLY · Log in to make changesLog in →
AJ RECORDS · FIT-OUT

build dashboard

8 Hanway Place, London W1T · Opening January 2027
MY ACCOUNT
TOTAL BUDGET
£1,900,000
set target
COMMITTED
£2,024,575
100% of budget
SPENT TO DATE
£398,350
21% paid
REMAINING
£124,575
over budget
BUDGET UTILISATION100.0% committed · 21.0% paid
Spent £398,350
Committed £2,024,575
Available £-124,575
SPEND BY CATEGORY
FINISHES9 items
£0 paid£325,775 budget
STRUCTURAL8 items
£169,500 paid£289,960 budget
PROF. FEES7 items
£157,850 paid£219,000 budget
FURNITURE7 items
£0 paid£212,940 budget
STUDIO6 items
£0 paid£185,000 budget
AV & TECH6 items
£0 paid£172,000 budget
KITCHEN5 items
£0 paid£168,000 budget
ELECTRICAL7 items
£36,500 paid£165,000 budget
MECHANICAL4 items
£34,500 paid£144,900 budget
BAR5 items
£0 paid£95,000 budget
SIGNAGE2 items
£0 paid£28,000 budget
CONTINGENCY1 item
£0 paid£19,000 budget
CUMULATIVE SPEND vs BUDGET TIMELINE
May 26
Jun 26
Jul 26
Aug 26
Sep 26
Oct 26
Nov 26
Dec 26
Jan 27
Budget trajectory
Actual cumulative spend
ITEM STATUS BREAKDOWN
43
PENDING
9
ORDERED
0
DELIVERED
11
INSTALLED
2
SNAGGED
2
COMPLETE
ACOUSTIC CONSULTANCY
CAHILL DESIGN CONSULTANTS LTDProposal Ref P3178 · 7 May 2026 · Rev 1.01
RESPONDED↓ PDF
KEY SITE CONCERNUnderground railway noise — Northern Line, Central Line & Elizabeth Line all pass beneath or adjacent to 8 Hanway Place. Railway-induced noise and vibration is the primary acoustic challenge for the recording studio in the basement.
SCOPE 1 — BASELINE SURVEY
·Internal noise & vibration from railway
·Background ambient sound levels
·Airborne sound insulation measurements
·External facade noise levels
FEE (EX. VAT)
£2,500
SCOPE 2 — ACOUSTIC DESIGN
·Noise & vibration ingress assessment
·Airborne sound insulation specifications
·Building services noise criteria
·Acoustic absorption & diffusion design
FEE (EX. VAT)
£4,000
TOTAL (INC. 20% VAT)
£7,800
£6,500 + VAT
CONTACTMark ScaifeDirector · Cahill Design Consultants Ltdinfo@cdc-limited.co.uk
INFO REQUIRED FROM CDCStudio use detailsArchitectural drawings (PDF + CAD)MEP layoutsStructural constraints